It will meet your heating needs for 1 month.
This is innovative 1 MW The system will provide thermal energy to the district heating network. When it starts working at full capacity, 100 MWh’a kadar will be able to store thermal energy; This means that the heating need for approximately one month in summer and one week in winter can be met. sand battery, It will function as an energy storage that provides high power and capacity by storing excess wind and solar energy as heat in the sand.
It will be integrated into the district heating network of Loviisan Lämpö in the Finnish municipality of Pornainen. Charging operations will be provided from the electrical grid using charging algorithms developed by Polar Night Energy, thus minimizing the electricity cost required for charging.
The next phase of the project will include various installation works. Testing of the sand battery is planned to begin in the winter months and become operational in 2025. Polar Night Energy commissioned the world’s first commercial sand-based high temperature heat storage system with a power of 100 kW and a capacity of 8 MWh in 2022.
This news our mobile application Download using
You can read it whenever you want (even offline):
What do you think?